Short Lead Time for Wellhead In Oil And Gas - Two piece forging floating ball valve – CEPAI

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Bear "Customer initially, High quality first" in mind, we do the job closely with our customers and supply them with efficient and skilled providers for Great North Wellhead And Frac , Double Gate Slab Gate Valve , Gate Valve Pn10, The concept of our company is "Sincerity, Speed, Service, and Satisfaction". We will follow this concept and win more and more customers' satisfaction.
Short Lead Time for Wellhead In Oil And Gas - Two piece forging floating ball valve – CEPAI Detail:

●Two Piece Forged Floating Ball Valve Construction and Function
Full Port or Reduce Port
Side Entry & Split Body & Two Piece
The Two Piece Forged Floating Ball Valve produced by CEPAI adopts an elastic seal ring structure design. When the medium pressure is low, the contact area between the sealing ring and the sphere is small, and a larger specific pressure is formed in the contact between the sealing ring and the sphere to ensure reliable sealing. When the medium pressure is high, the contact area between the sealing ring and the sphere increases with the elastic deformation of the sealing ring, so the sealing ring can withstand a large medium thrust without being damaged.

● Fire Safe Design Per API607 & API 6FA
Two Piece Forged Floating Ball Valve produced by CEPAI has a fire protection design function and meets the requirements of API 607, API 6FA and other standards.Two Piece Forged Floating Ball Valve produced by CEPAI can effectively control the leakage of Valve with the help of specially designed metal-to-metal auxiliary sealing structure after the non-metallic material sealing ring is damaged in high temperature when a fire occurs in the service site of the valve.

● Blowout-Proof Stem Design
The Two Piece Forged Floating Ball Valve produced by CEPAI has an anti-blow-out structure for the valve stem, which can ensure that the valve stem will not be blown out by the medium even under extreme conditions such as abnormal pressure rise in the valve chamber and failure of the packing pressure plate. The valve stem adopts a bottom-mounted structural design with an back seal. The sealing force of the back seal increases with the increase of the medium pressure, so it can ensure the reliable seal of the stem under various pressures.

● Anti-Static Design
The Two Piece Forged Floating Ball Valve produced by CEPAI can be equipped with an anti-static structure. A spring plug type electrostatic extraction device is used to directly form an electrostatic passage between the ball and the valve body (for ball valves with DN ≤ 25) or through the valve stem to form an electrostatic passage between the ball and the valve body (for ball valves with DN ≥ 32) ). Therefore, static electricity generated by the friction between the ball and the valve seat can be led to the ground through the valve body to prevent possible fire or explosion hazards caused by static sparks.

● Optional locking device
Two Piece Forged Floating Ball Valve produced by CEPAI has designed a keyhole structure so that clients can lock the valve according to their needs to prevent misoperation.

●Two Piece Forged Floating Ball Valve Main Parts & Material List
Body/Bonnet Forged: A105N,LF2,F11,F22,F304,F316,F51,F53,F55,N08825,N06625;
Seat PTFE,R-PTFE,Devlon,Nylon,PEEK;
Ball A105,F6,F304,F316,F51,F53,F55,N08825,N06625;
Stem F6,F304,F316,F51,F53,F55,N08825,N06625;
Packing Graphite,PTFE;
Gasket SS+Graphite,PTFE;
Bolt/Nut B7/2H,B7M/2HM,B8M/8B,L7/4,L7M/4M;
O-Ring NBR,Viton;

●Two Piece Forged Floating Ball Valve
Two Piece Forged Floating Ball Valve produced by CEPAI is mainly used to block or connect the medium in the pipeline. Choose Two Piece Forged Floating Ball Valve of different materials can be used for water, steam, oil, liquefied gas, natural gas, gas, nitric acid,carbamide and other medium.


Product detail pictures:

Short Lead Time for Wellhead In Oil And Gas - Two piece forging floating ball valve – CEPAI detail pictures

Short Lead Time for Wellhead In Oil And Gas - Two piece forging floating ball valve – CEPAI detail pictures

Short Lead Time for Wellhead In Oil And Gas - Two piece forging floating ball valve – CEPAI detail pictures

Short Lead Time for Wellhead In Oil And Gas - Two piece forging floating ball valve – CEPAI detail pictures

Short Lead Time for Wellhead In Oil And Gas - Two piece forging floating ball valve – CEPAI detail pictures

Short Lead Time for Wellhead In Oil And Gas - Two piece forging floating ball valve – CEPAI detail pictures


Related Product Guide:

We've been committed to offering easy,time-saving and money-saving one-stop purchasing service of consumer for Short Lead Time for Wellhead In Oil And Gas - Two piece forging floating ball valve – CEPAI , The product will supply to all over the world, such as: Sao Paulo, Swaziland, Qatar, Meanwhile, we're building up and consummating triangle market & strategic cooperation in order to achieve a multi-win trade supply chain to expand our market vertically and horizontally for a brighter prospects. development. Our philosophy is to create cost-effective products and solutions, promote perfect services, cooperate for long-term and mutual benefits, firm a in depth mode of excellent suppliers system and marketing agents, brand strategic cooperation sales system.
  • Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
    5 Stars By Rigoberto Boler from Swiss - 2017.10.25 15:53
    Cooperate with you every time is very successful, very happy. Hope that we can have more cooperation!
    5 Stars By Elizabeth from Mexico - 2017.08.21 14:13
    Write your message here and send it to us